We just finished this interior courtyard at a commercial project. The first picture is what it looked like the morning we arrived. The rest of the pictures were taking a 2 days later when the job was completed. What a difference!
This project had its own set of interesting points.
- We had to import all the material into the courtyard through the building
- The doors that we used to come into the area had to be lock at all times
- It rained almost the entire time we were there
- There was mud, and more mud
- We used Rubber Mulch in the beds instead of the common Bark Mulch
However, the end result was stunning, and everyone is pleased with the final product.